5.4
NORMAL OPERATION
1. Open and lock out main power disconnect.
2. Check lubricoolant level. Refill if necessary.
3. Re-close disconnect switch. Micro processor will illuminate indicating compressor is ready to start.
4. Fully open service air valve.
5. Start machine by pressing ‘run’ button on micro processor.
Observe pressure and temperature. If temperature is incorrect, refer to SECTION 6.7 – TROUBLE
SHOOTING. Observe pressure and temperature. If temperature is incorrect, refer to SECTION 6.7
– TROUBLE SHOOTING
.
5.5 SHUTDOWN
To stop compressor, press ‘stop’ key on micro processor.
5.6 RESTARTS
After a power failure, open and lock out the main disconnect, check all fuses and breakers. Close
disconnect switch and follow Normal Operation start-up procedure.
Following a shutdown caused by either of the protective devices (i.e. temperature or R.O.P.), open and
lock out the main disconnect switch, correct the cause of shutdown, reset electrical controls, then close
the disconnect and follow Normal Operation start-up procedure.
Check lubricoolant level. Refill if necessary.
Re-close disconnect switch.
Start machine by pressing ‘run’ key on micro processor.
Fully open service air valve.
Observe pressure and temperature displayed by micro processor.
Summary of Contents for 125UD
Page 2: ......
Page 26: ...SULLIVAN PALATEK__________________________________ 26 NOTES ...
Page 27: ...__________________________________SULLIVAN PALATEK 27 PARTS LISTING ...
Page 30: ...SULLIVAN PALATEK__________________________________ 30 DRIVE AND BASE ASSEMBLY 125 250UD ...
Page 31: ...__________________________________SULLIVAN PALATEK 31 7 3 DRIVE AND BASE ASSEMBLY 125 250UD ...
Page 40: ...SULLIVAN PALATEK__________________________________ 40 DISCHARGE SYSTEM 125 150UD ...
Page 42: ...SULLIVAN PALATEK__________________________________ 42 DISCHARGE SYSTEM 200 250UD ...
Page 44: ...SULLIVAN PALATEK__________________________________ 44 MICROPROCESSOR CONTROL OPEN 125 250UD ...
Page 48: ...SULLIVAN PALATEK__________________________________ 48 ENCLOSURE AIR COOLED 125 250UD ...
Page 50: ...SULLIVAN PALATEK__________________________________ 50 ENCLOSURE AIR COOLED 200 250UD ...
Page 52: ...SULLIVAN PALATEK__________________________________ 52 ENCLOSURE WATER COOLED 125 250UD ...
Page 54: ...SULLIVAN PALATEK__________________________________ 54 7 15 DECAL T1 INSTRUCTIONS YASKAWA ...