Section 5
OPERATION
19
5.3 INITIAL START--UP PROCEDURE
The following procedure should be used to make the
initial start--up of the compressor:
1. Read the preceding pages of this manual thor-
oughly.
2. Be sure that all preparations and checks de-
scribed in the Installation section have been
made.
3. Crack open the shut off valve to the service line.
4. Start the compressor by pushing the START but-
ton.
5. Check for possible leaks in piping.
6. Slowly close the shut--off valve and check that the
setting on the pressure switch in set correctly. If
set correctly, the compressor will unload at the
desired unload pressure. If adjustments are nec-
Cont r ol S y s t em A djus t m ent s
Maintenance Section of the manual.
7. Observe the operating temperature. If the operat-
ing temperature exceeds 230
_
F (129
_
C), the
cooling system or installation environment
should be checked.
NOTE
High inlet air temperatures will result in high dis-
charge air temperatures.
8. Observe return line sight glass and maintenance
indicators.
9. Open shut--off valve to service line.
10. Reinspect the compressor for temperature and
leaks the following day.
5.4 SUBSEQUENT START--UP PROCEDURE
On subsequent start--ups, check that the proper lev-
el is visible in the fluid sight glass and simply press
the START button. When the compressor is run-
ning, observe the instrument panel and mainte-
nance indicators.
5.5 SHUTDOWN PROCEDURE
To shut the compressor down, simply press the
STOP button.
Summary of Contents for 20/12 500 CFM
Page 12: ...Section 2 DESCRIPTION 8 Figure 2 3 Piping and Instrumentation...
Page 14: ...Section 2 DESCRIPTION 10 Figure 2 5 Capacity Control System Typical...
Page 18: ...14 NOTES...
Page 20: ...16 NOTES...
Page 24: ...20 NOTES...
Page 38: ...34 NOTES...
Page 40: ...Section 7 ILLUSTRATIONS AND PARTS LIST 36 7 3 MOTOR FRAME COMPRESSOR AND PARTS...
Page 42: ...Section 7 ILLUSTRATIONS AND PARTS LIST 38 7 4 AIR INLET SYSTEM...
Page 44: ...Section 7 ILLUSTRATIONS AND PARTS LIST 40 7 5 COOLING AND LUBRICATION SYSTEM...
Page 46: ...Section 7 ILLUSTRATIONS AND PARTS LIST 42 7 6 COOLER ASSEMBLY...
Page 48: ...Section 7 ILLUSTRATIONS AND PARTS LIST 44 7 7 DISCHARGE SYSTEM...
Page 50: ...Section 7 ILLUSTRATIONS AND PARTS LIST 46 7 7 DISCHARGE SYSTEM...
Page 52: ...Section 7 ILLUSTRATIONS AND PARTS LIST 48 7 8 INSTRUMENT PANEL AND PARTS...
Page 54: ...Section 7 ILLUSTRATIONS AND PARTS LIST 50 7 9 CONTROL SYSTEM...
Page 56: ...Section 7 ILLUSTRATIONS AND PARTS LIST 52 7 9 CONTROL SYSTEM...
Page 58: ...Section 7 ILLUSTRATIONS AND PARTS LIST 54 7 10 ELECTRIC CONTROL BOX...
Page 60: ...Section 7 ILLUSTRATIONS AND PARTS LIST 56 7 11 UNIT TUBING...
Page 62: ...Section 7 ILLUSTRATIONS AND PARTS LIST 58 7 11 UNIT TUBING...
Page 64: ...Section 7 ILLUSTRATIONS AND PARTS LIST 60 7 12 DECAL GROUP...