Stûv 30-up - installation [en] - 0209
SN 68 719 > ...
When the installation of the stove is complete…
…carry out a test to ensure it is
working correctly.
Before this test, ensure no items
involved in installation have been left
in the combustion chamber or in the
bends (spray paint, tubes of grease,
tools).
When the fire is first lit, some smoke
or odours may be produced: Ensure
plenty of ventilation.
See directions for use.
Once installation is complete, return
the directions for use to the user. Fill in
the guarantee certificate with him/her
(at the back of the directions for use)
and advise him/her to return it to the
manufacturer or importer.
Above, the folds of the convection
column are attached onto the back
of the connection chamber support
[photo 7].
If necessary, install the insulating panel
of the convection column (dimensions
188 x 1347 mm). Cut this by the
same amount as the other parts of the
convection column.
Insert it at the back [photo 9] – metal
side facing the source of the heat
– and place on the support of the
column [photo 10-c].
See [figure 8]
d telescopic duct
e convection column – front part
f insulating panel (metal part towards
the flue)
e convection column – back part
Place the back metal sheet of the
convection column in [10-c] and
attach it using M5 screws with
countersunk heads (Allen key size 3),
the 2 screws on the right first, then
the 2 screws on the left. This back
part is vital.
Control the feeding of the convection
column and the connection chamber
using the set screw indicated
[photo 11].
Position the upper plate [photo 12].