12
b
1
2
3
a
Stûv 30-up - installation [en] - 0209
SN 68 719 > ...
Installation of the upper part
There are 6 configurations
for which Stûv has provided
6 “connection sets.”
Always comply with the applicable
regulations on safety distances.
Configuration 1
Connection to a flue union flush with
or slightly set into the ceiling.
Connection set n°1 [figure 1] is made
up of:
– 1 Ø 180 flue union
– 1 x 220 mm disc plate with screws
– 1 Ø 180 adjustable connection
– 1 x 220 mm connection chamber
with supports
Assemble the ceiling disc plate [a] and
the upper support of the connection
box [b] aligning the back part of the
disc plate and the vertical back part of
the support [photo 2].
Position all of this on the ceiling.
Ensure the back of the disc plate is
tight against the wall (otherwise a
wedge is required to compensate
where the wall is not vertical) and
the upper support of the chamber is
centred on the axis of the duct [photo
3]. Mark the 4 holes of the disc plate,
and the "V" of the support.
Configuration n° 1
Connection to a
union flush with or
slightly set into the
ceiling
Configuration n° 2
Connection to a
union extending
beyond the ceiling
(5 cm maximum)
Configuration n° 3
Connection to a
metal insulated duct
flush with or slightly
set into the ceiling
Configuration n° 4
Connection to an
insulated metal duct
extending beyond
the ceiling (15 cm
maximum)
Configuration n° 5
Back connection to a
union or a brickwork
flue
Configuration n° 6
Back connection to
an insulated metal
duct extending
beyond the wall
(1 cm maximum)