53
© STULZ GmbH – all rights reserved EN/06.2018/G42
cybercool 2 scroll original insTrUcTions
Construction sizes 3 - 4:
The electrical connection lines can be introduced into the electric cabinet from the bottom.
The following bottom views display the apertures.
Size 3:
Size 4:
Air inlet
Air inlet
Reserve
Option: second power
supply
Power supply
Grounding
Condensate drain of el. cabi net
Outside temp. sensor
Control line
Reserve
Condensate drain of
el. cabinet cooling
Grounding
Control line
Option: second power supply
Power supply
Outside temp. sensor