Stübbe PTM C2 Series Original Operating Manual Download Page 6

Installation and connection

4.4

Disposal

Plastic parts can be contaminated by poisonous or radioac-
tive media to such an extent that cleaning will not be suf

fi

-

cient.

WARNING

Risk of poisoning and environmental damage from
medium.

Use personal protective equipment when carrying out any
work on the device.
Prior to the disposal of the device: Neutralize residues of
medium in the device.

1. Remove battery and dispose of in accordance with local

regulations.

2. Remove electronic parts and dispose of in accordance with

local regulations.

3. Dispose of plastic parts in accordance with local regula-

tions.

5

Installation and connection

5.1

Check operating conditions

1. Ensure the required operating conditions are met:

Resistance of body and seal material to the medium
(

resistance lists).

Media temperature

(

9.1 Technical speci

fi

cations,

Page 8).

Working pressure

(

9.1 Technical speci

fi

cations,

Page 8).

2. Consult with the manufacturer regarding any other use of

the device.

5.2

Installing device in the process
pipework

Process pipework has been properly prepared.
Process pipework has been secured against unintentional
opening with shut-off values.

Avoidance of medium buildup.
Select installation location so that no build-up or crystalliza-
tion is possible.

WARNING

Risk of injury and poisoning due to medium spraying out.

Use personal protective equipment when carrying out any
work on the

fi

tting.

1. Unscrew union nut.
2. Insert union nut on to the spool piece of the process

pipework.
Check mounting direction.

3. Weld device insert to the process pipework spool piece.
4. Check O-ring

fi

tting.

5. Connect device to the process pipework. Tighten union nut

by hand only.

5.3

Performing the hydrostatic test

Perform hydrostatic test using neutral medium, e.g. water.

1. Pressurize the device, ensuring

Test pressure < 1.5 x P

N

(Nominal pressure)

Test pressure < P

N

+ 5 bar

Test pressure < permissible system pressure

2. Check that the device is not leaking.

5.4

Electrical connection of device

Device is connected to the process pipework.
Power supply switched off and secured against being
switched back on again.

Cable without shielding can be used to connect the device.
If electromagnetic interference is anticipated, then shielded
cable must be used.

1. Cut sensor cable supplied to length.
2. Fit plug

(

9.3 Plug assignment, Page 8).

3. Connect sensor housing with sensor cable.

6

PTM C2

BA-2016.11.24 EN

300 196

Summary of Contents for PTM C2 Series

Page 1: ...No 300 196 TR MA DE Rev002 ASV St bbe GmbH Co KG Hollwieser Strasse 5 32602 Vlotho Germany Phone 49 0 5733 799 0 Fax 49 0 5733 799 5000 Email contact asv stuebbe de Internet www asv stuebbe com We res...

Page 2: ...3 Storage 5 4 4 Disposal 6 5 Installation and connection 6 5 1 Check operating conditions 6 5 2 Installing device in the process pipework 6 5 3 Performing the hydrostatic test 6 5 4 Electrical connect...

Page 3: ...and the other applicable documents especially all safety instructions and warnings 1 2 Other applicable documents To download Resistance Guide Chemical resistance of the materials used www asv stuebbe...

Page 4: ...d Make personal protective equipment available Qualified personnel Make sure all personnel tasked with work on the device have read and understood this manual and all other appli cable documents espec...

Page 5: ...4 1 Unpacking and inspection on delivery 1 Unpack the device when received and inspect it for trans port damage and completeness 2 Check that the information on the type plate agrees with the order de...

Page 6: ...against unintentional opening with shut off values Avoidance of medium buildup Select installation location so that no build up or crystalliza tion is possible WARNING Risk of injury and poisoning due...

Page 7: ...again Provide warning of maintenance and repair work and set up warning signs 7 1 Servicing Interval Action As necessary Clean device with a damp cloth Six monthly Visual and function check Normal ope...

Page 8: ...Possible cause Corrective action Medium is leaking out of the flange Pre tension of the O ring too small Retighten union nut by hand Tab 4 Troubleshooting 9 Appendix 9 1 Technical specifications Tech...

Reviews: