Stübbe PTM C2 Series Original Operating Manual Download Page 3

About this document

1

About this document

This manual

is part of the equipment

applies to all series referred to

describes safe and proper operation during all operating
phases

1.1

Target groups

Operating company

Responsibilities:

Always keep this manual accessible where the device
is used on the system.

Ensure that employees read and observe this docu-
ment, particularly the safety instructions and warnings,
and the documents which also apply.

Observe any additional country-speci

fi

c rules and reg-

ulations that relate to the system.

Quali

fi

ed personnel,

fi

tter

Mechanics quali

fi

cation:

Quali

fi

ed employees with additional training for

fi

tting

the respective pipework.

Electrical quali

fi

cation:

Quali

fi

ed electrician

Transport quali

fi

cation:

Quali

fi

ed transport specialist

Responsibility:

Read, observe and follow this manual and the other
applicable documents, especially all safety instructions
and warnings.

1.2

Other applicable documents

To download:

Resistance Guide

Chemical resistance of the materials
used

www.asv-stuebbe.de/pdf_resistance/300051.pdf

To download:

Data sheet

Technical data, operating conditions

www.asv-stuebbe.de/pdf_datasheets/300190.pdf

To download:

CE declaration of conformity

Conformity with standards

www.asv-stuebbe.de/pdf_DOC/300298.pdf

Tab. 1

Other application documents, purpose
and where found

1.3

Warnings and symbols

Symbol

Meaning

Immediate acute risk

Death, serious bodily harm

Potentially acute risk

Death, serious bodily harm

Potentially hazardous situation

Minor injury

Potentially hazardous situation

Material damage

Safety warning sign

Take note of all information
highlighted by the safety warning
sign and follow the instructions to
avoid injury or death.

Instruction

1. , 2. , …

Multiple-step instructions

Precondition

Cross reference
Information, notes

Tab. 2

Warnings and symbols

300 196

BA-2016.11.24 EN

PTM C2

3

Summary of Contents for PTM C2 Series

Page 1: ...No 300 196 TR MA DE Rev002 ASV St bbe GmbH Co KG Hollwieser Strasse 5 32602 Vlotho Germany Phone 49 0 5733 799 0 Fax 49 0 5733 799 5000 Email contact asv stuebbe de Internet www asv stuebbe com We res...

Page 2: ...3 Storage 5 4 4 Disposal 6 5 Installation and connection 6 5 1 Check operating conditions 6 5 2 Installing device in the process pipework 6 5 3 Performing the hydrostatic test 6 5 4 Electrical connect...

Page 3: ...and the other applicable documents especially all safety instructions and warnings 1 2 Other applicable documents To download Resistance Guide Chemical resistance of the materials used www asv stuebbe...

Page 4: ...d Make personal protective equipment available Qualified personnel Make sure all personnel tasked with work on the device have read and understood this manual and all other appli cable documents espec...

Page 5: ...4 1 Unpacking and inspection on delivery 1 Unpack the device when received and inspect it for trans port damage and completeness 2 Check that the information on the type plate agrees with the order de...

Page 6: ...against unintentional opening with shut off values Avoidance of medium buildup Select installation location so that no build up or crystalliza tion is possible WARNING Risk of injury and poisoning due...

Page 7: ...again Provide warning of maintenance and repair work and set up warning signs 7 1 Servicing Interval Action As necessary Clean device with a damp cloth Six monthly Visual and function check Normal ope...

Page 8: ...Possible cause Corrective action Medium is leaking out of the flange Pre tension of the O ring too small Retighten union nut by hand Tab 4 Troubleshooting 9 Appendix 9 1 Technical specifications Tech...

Reviews: