
- 6 -
Cont ...
F.
Lifting/Positioning
1.25
DO NOT
lift the booster set by the pipework or by the control panel, the pressure
vessel is supplied lose for transport purposes, please ensure that the booster set
has been installed and connected to the suction and discharge pipework before
installing the pressure vessel. On no account should the pressure vessel be
used to “manouvre” the booster set into place. Care should be taken when
handling this product due to it’s weight.
1.26 This equipment must not be pressurised beyond maximum working pressure
(refer to technical specifications).