Reference Fig 11:
•
Remove 4 screws (item 23), and carefully remove terminal box lid.
•
IMPORTANT:
Take note of capacitor wiring connection and colours before removal.
Disconnect and remove capacitor (item 24) and foam securing pad (item 26), make note of
pad fitted position.
Damaged components must be replaced. Contact Stuart Turner for
advice on replacements not supplied with kit.
•
REASSEMBLY
Reassembly is the reverse of the disassembly instructions, with new replacement parts fitted
as required.
Note: For correct installation the capacitor must be connected, secured and positioned as
detailed (Figs. 13 & 14).
Secure terminal box lid screws to a torque of 0.8 Nm (item 23).
IMPORTANT NOTE:
For correct pump rotation, ensure both blue wires are connected to the
linked capacitor terminals as shown.
•
INITIAL OPERATING INSTRUCTIONS
•
Consult instruction manual for commissiong instructions.
•
Do not run pump dry. Allow the water to be pumped to enter the pump body thus ensuring
the seal is lubricated before switching the pump on. Failure to do this will damage the
seal.
•
Carefully check pump and pipework for leaks whilst pump running and stationary before
leaving the installation unattended.