17
Strong Enterprises owner’s manual. Para-Cushion
www.strongparachutes.com [email protected]
6.3 Riser and Line Stows
6.3.1
Insert the T-bars up through the
three grommets located in the
bottom of the container.
6.3.2
Open the riser covers on the bottom
of the container and lay risers in
the channel. Close riser cover over
risers by securing the hook and loop
fastener.
6.3.3
Right line group will be 14-16”
longer than the left line group.
Bring excess line to container end,
keeping lines even from canopy to
container. Stow the first bight of
lines in the outermost rubber band
on the wearer’s lower left corner of
the container.
Note:
This bight should contain all the
lines. There will be excess in the
right line group between the riser
links and this first line stow.
First Stow (all lines)
Excess Right Line group