29
Strong Enterprises owner’s manual. Para-Cushion
www.strongparachutes.com [email protected]
9.1
Thread steering line through guide
ring then through the grommet
in the toggle, starting from the
underside of the toggle (the side
with Velcro®).
Lay the toggle on the riser where
it will be when set, and measure
where the steering line should be
tied. There should be one or two
inches of slack in the steering line
after the rest of the lines are pulled
tight.
9.2
Make two “Figure-8” with the line
through the grommet and secure
with an overhand knot.
9.3
Mate the Velcro® to secure the
toggle to the riser.
9. Installing the Toggles