Page 6 of 11
Final assembly for all types of flue
Following satisfactory installation of the convection box into the opening, proceed as follows:
1. Connect the gas supply pipe to the inlet elbow.
2. Refit the front casing and secure with the 2 screws at the bottom sides. Slide the
canopy over its retaining screws, make sure the canopy and outer casing are
positioned correctly and tighten the two screws.
3. Where applicable fit high level control knob on tap spindle and tighten grub screw onto
the flat. Ensure that the knob rotates without rubbing on the casing; if necessary
slacken the grub screw and reposition.
4. The ceramic components are fragile and should be handled with care. Refer to Figs. 4
and 5 for positioning of ceramic fibre blocks and coals.
5. Place the back ceramic on the burner, against the back of the convector firebox.
6. Place a flat ceramic pad against each side of the firebox, with the angled corner facing
forward. The pads are identified 'L' and 'R'. Position them each side of the back
ceramic.
7. Slide the front ceramics down between the upturned front edge of the burner plate and
the front coal support.
8. Remove the coals from the bag; note that 2 sizes are supplied. Place them on the
ceramic blocks in accordance with Fig. 4.
9. If a flat trim has been supplied, attach it to the fire flange by means of the magnets.
Fig. 4 Placing the ceramics & loose coals
Back ceramic
L.H. Pad
R.H. pad
L.H. front ceramic
R.H. front ceramic
Large coals (7)
Small coals (2)