
Site Planning for ftServer 2900, 4900, and 6900 Systems
1-1
Chapter 1
Site Planning for ftServer 2900, 4900,
and 6900 Systems
1-
For an overview of required information and tasks you need to perform to prepare a site
for ftServer 2900, 4900, and 6900 systems, see:
“Site Planning Overview” on page 1-1
“Site Planning Checklist” on page 1-3
“System Documentation” on page 1-7
N O T I C E S
1. See
for a list of
important safety notices that you should review as
part of your site planning.
2. See
for information about
standards compliance.
Site Planning Overview
Site planning for fault-tolerant systems includes:
Purchasing an appropriate cabinet and monitor
Provide a monitor that meets the system’s requirements.
N O T E
A monitor, keyboard, and mouse are required to install
Automated Uptime Layer.
If you do not purchase a cabinet from Stratus, provide a cabinet that meets the
system’s requirements.