Stratasys Eden260VS Site Preparation Manual Download Page 4

Materials Handling and Storage

19

Printing Materials

19

Cleaning Solvent

19

Site Preparation Checklist

20

DOC-09669 Rev. H

4

Summary of Contents for Eden260VS

Page 1: ...DOC 09669 Rev H 3D Printing System Site Preparation Guide Eden260VS...

Page 2: ...form or by any means nor stored in a database or retrieval system without prior permission in writing from Stratasys Ltd If this document is distributed as a PDF file you may print it for internal use...

Page 3: ...ter Area 10 Workstation Requirements 11 Electrical Requirements 12 Power 12 Grounding 12 Circuit Breaker 13 Residual Current Device RCD 13 Power Connection 13 UPS Uninterrupted Power Supply 13 Communi...

Page 4: ...Materials Handling and Storage 19 Printing Materials 19 Cleaning Solvent 19 Site Preparation Checklist 20 DOC 09669 Rev H 4...

Page 5: ...atasys representative All site requirements must be met before the installation date The Site Preparation Checklist should be submitted to your Stratasys representative Shipping will be arranged after...

Page 6: ...Weight Unit W H D cm W H D inch Weight kg lb Eden260V 87 120 73 5 34 2 47 2 29 254 kg 559 lb Table 1 Size and weight The following table shows the size and weight information for Eden260V printers W W...

Page 7: ...s service provider will advise regarding these matters Note Only Stratasys certified Customer Support Engineers are authorized to unpack and install equipment supplied Shipping Pallet The following ta...

Page 8: ...the back and sides of the packaging is required for unpacking the printer A clearance of 180 cm 6 ft from the front is required for unloading the printer from the pallet The installation location must...

Page 9: ...ld be located in the same room The cable between the server workstation and the printer should not exceed 5 meters 16 feet The communication cable provided should not be extended or replaced with a lo...

Page 10: ...is a sample floor plan showing the 3D printing system the printer and the workstation The dimensions shown in the figure are the minimum clearance requirements Figure 2 Printer floor plan sample not t...

Page 11: ...are required on the server workstation These specifications are also recommended for any additional client workstations running Objet Studio 1 For systems using a KVM switch box to control both the bu...

Page 12: ...VAC 50 60 Hz 14 A 1 phase 220 240 VAC 50 60 Hz 7 A 1 phase Printer short circuit rating 1000 A If the power at the facility does not support the above specifications contact your Stratasys specialist...

Page 13: ...an The following electrical outlets are required one outlet behind the printer three outlets close to the printer for the workstation monitor and servicing equipment UPS Uninterrupted Power Supply It...

Page 14: ...ere tested at Stratasys and meet the above requirements Eaton PW9130G3000T 220 240 VAC Eaton PW9130L2000T XL 100 120 VAC 1Single phase 50 60 Hz 2Defined as the input to output ratio of the UPS 3UPS un...

Page 15: ...connected to a local network as shown in the following diagram Figure 4 Network installation The connection to the local network should be established prior to printer installation Telephone A telepho...

Page 16: ...0 BTU hr The room temperature and relative humidity should not exceed the limits listed in the table below Range Temperature 18 C to 25 C 64 5 F to 77 F Relative humidity 30 70 non condensing Table 6...

Page 17: ...hen attached to the back of the printer and connected to an external ventilation fan with a duct air expelled from the printer is discharged directly outdoors as shown in the figure below Required Suc...

Page 18: ...include an air dryer unit a water oil trap must be installed on the air gun used for cleaning the printer The recommended air pressure is 5 7 bar 70 90 PSI Fire Safety Equipment A gas based fire extin...

Page 19: ...or most printing materials Requirements for handling and storing specific materials appear in the Material Safety Datasheet MSDS included with each material Note Non compliance with these recommendati...

Page 20: ...e listing all of the tasks described in this document Fill in the information requested in the checklist and submit it to your Stratasys representative An installation date will be scheduled after the...

Page 21: ...et260 Connex3 Objet350 Connex1 Objet350 Connex2 Objet350 Connex3 Objet500 Connex1 Objet500 Connex2 Objet500 Connex3 Durus Endur Vero VeroBlue VeroBlackPlus VeroClear VeroCyan VeroDent VeroDentPlus Ver...

Reviews: