
INSTRUCTIONS FOR THE MACHINE
Cleaning:
All bright parts of the machine are treated with rust preventive.
By removing this, be
careful not to use too strong cleaning compond. The paint might then get
damaged.
Installation:
The machine must be installed on a firm foundation. The baseplate must be levelled
with washers on the foundation bolts to prevent harmful stresses when the nuts are
tightened.
Lubrication:
All high-speed shafts and gears are journalled in bolt bearings or roller bearings, so
that the machine needs very little lubrication. Same is valid for the gear box of the
elevating drive. By removing the front cover on the gear box the main gear box and
the spindle are availble for lubrication of bearings and gears if necessary.
On machines equipped with power feed the worm gear operates in an oil bath. Oil,
about 0,4 l, is filled in a hole situated behind the feed drive shaft on the side of the
spindle housing. The oil lever is controlled in the oil gauge sight glass. The oil is
drained in the bottom of the feed gear box. A good branch gear box oil of 11
o
at 50
o
should be used.
Please see separate oilrecommendation.
Connections to mains:
Remove the cover plate on the back side of the column. Connect line, earth and ZP
according to attached wiring diagram. Before putting back the cover plate, start the
machine in order to control the correct rotation of the spindle.
14