![Strand VISION.NET User Manual Download Page 17](http://html1.mh-extra.com/html/strand/vision-net/vision-net_user-manual_1383376017.webp)
User ManUal
w w w. s t r a n d l i g H t i n g .co M
Vision.net Hardware
17
WIrInG
Ceiling Occupancy Sensors should be connected to a Vision.Net station.
To connect wiring to ceiling occupancy sensors:
Step 1.
If conduit is required by local code, route low voltage wiring into adjacent junction box and secure
with included 1/2- inch nipple.
Step 2. Connect low voltage network to Interface Board with (4) #18 AWG (.75 mm2) wires according to the
wiring diagram below.
Note: Up to eight (8) Occupancy Sensors may be linked in parallel.