INSTALLATION
Commissioning
Pressure test point
Use the oven burner. From inside the
oven remove the burner cowl. Remove
the small screw at the LHS of the burner
cradle. Slide the burner to the left to
access the injector.
Connect suitable T-piece (incorporating
a 115 injector) to the injector. Connect
manometer to the T-piece, and turn oven
control to full on to check pressure.
Replace in reverse order.
Burner aeration
All burners have fixed aeration and no
adjustment is possible.
Pressure setting
See technical data.
Electrical systems check
In the event of an electrical fault the
preliminary electrical system check (earth
continuity, short circuit, polarity and
resistance to earth) must be carried out.
Oven Ignition
Follow the instructions for turning on the
oven. Turn the oven full on to 250°C or
setting 9. The automatic ignition system
will spark automatically. The sparking will
stop. If after 10 seconds, the burner has
not lit, the system will lock out and show
an error turn off the oven and leave the
compartment door open. Wait at least one
minute before a further attempt to ignite
the burner.
When switching on the product for the
first time this may take afew attempts to
purge the gas through the system.
To turn off, return the control knob to the
“off” position.
Grill
1. The door must be open for grilling.
2. Turn the control knob anticlockwise to
the grill symbol.
Before leaving the installation
Show the customer how to operate
the oven and grill and give them this
handbook. Thank you.