background image

866-795-1586 • WWW.STONEAGETOOLS.COM

32

1. 

 Acceptance of Terms and Conditions.

  Receipt of these 

Terms and Conditions of Sale (“Terms and Conditions”) shall 
operate as the acceptance by StoneAge, Inc. (“Seller”) of the 
order submitted by the purchaser (“Buyer”).  Such acceptance 

is made expressly conditional on assent by Buyer to these 

Terms and Conditions.  Such assent shall be deemed to have 

been given unless written notice of objection to any of these 

Terms and Conditions (including inconsistencies between 

Buyer’s purchase order and this acceptance) is given by Buyer 
to Seller promptly on receipt hereof.  

Seller desires to provide Buyer with prompt and efficient 
service.  However, to individually negotiate the terms of each 
sales contract would substantially impair Seller’s ability to 
provide such service.  Accordingly, the product(s) furnished 
by Seller are sold only according to the terms and conditions 
stated herein and with the terms and conditions stated in any 

effective StoneAge Dealer Agreement or StoneAge Reseller 
Agreement, if applicable.  Notwithstanding any terms and 
conditions on Buyer’s order, Seller’s performance of any 
contract is expressly made conditional on Buyer’s agreement 

to these Terms and Conditions unless otherwise specifically 

agreed to in writing by Seller.  In the absence of such 
agreement, commencement of performance, shipment and/
or delivery shall be for Buyer’s convenience only and shall not 

be deemed or construed to be an acceptance of Buyer’s terms 

and conditions.

2. 

Payment/Prices. 

 Unless other arrangements have been 

made in writing between Seller and Buyer, payment for the 
product(s) shall be made upon receipt of invoice.  The prices 
shown on the face hereof are those currently in effect.  Prices 
invoiced shall be per pricelist in effect at the time of shipment.  
Prices are subject to increase for inclusion of any and all taxes 
which are applicable and which arise from the sale, delivery or 
use of the product(s), and the collection of which Seller is or 
may be responsible to provide to any governmental authority, 
unless acceptable exemption certificates are provided by Buyer 
in accordance with applicable law.  Buyer shall pay all charges 
for transportation and delivery and all excise, order, occupation, 
use or similar taxes, duties, levies, charges or surcharges 
applicable to the product(s) being purchased, whether now 
in effect or hereafter imposed by any governmental authority, 
foreign or domestic.

3. 

Warranty.

  SELLER MAKES NO WARRANTIES OR 

REPRESENTATIONS AS TO THE PERFORMANCE OF ANY 
PRODUCT EXCEPT AS SET FORTH IN THE STONEAGE 
LIMITED WARRANTY PROVIDED WITH THE PRODUCT.  

4. 

Delivery. 

 Seller is not obligated to make delivery by a 

specified date, but will always use its best efforts to make 
delivery within the time requested.  The proposed shipment 
date is an estimate.  Seller will notify Buyer promptly of any 
material delay and will specify the revised delivery date as 
soon as practicable.  UNDER NO CIRCUMSTANCES SHALL 
SELLER HAVE ANY LIABILITY WHATSOEVER FOR LOSS OF 
USE OR FOR ANY DIRECT OR CONSEQUENTIAL DAMAGES 
RESULTING FROM DELAY REGARDLESS OF THE REASON(S).

All product(s) will be shipped F.O.B. point of origin, unless 
specifically agreed otherwise, and Buyer shall pay all shipping 
costs and insurance costs from that point.  Seller, in its sole 
discretion, will determine and arrange the means and manner of 

transportation of the product(s).  Buyer shall bear all risk of loss 

commencing with the shipment or distribution of the product(s) 

from Seller’s warehouse.  Order shortages or errors must 
be reported within fifteen (15) business days from receipt of 
shipment to secure adjustment.  No product(s) may be returned 
without securing written approval from Seller.  

5. 

Modification.

  These Terms and Conditions are intended by 

Seller and Buyer to constitute a final, complete and exclusive 

expression of agreement relating to the subject matter hereof 
and cannot be supplemented or amended without Seller’s prior 
written approval.  

6. 

Omission. 

 Seller’s waiver of any breach or Seller’s failure 

to enforce any of these Terms and Conditions at any time, shall 
not in any way affect, limit or waive Seller’s right thereafter to 

enforce and compel strict compliance with every term and 
condition hereof.  

7. 

Severability. 

 If any provision of these Terms and Conditions 

is held to be invalid or unenforceable, such invalidity or 
unenforceability shall not affect the validity or enforceability of 
the other portions hereof.

8. Disputes.

  Seller and Buyer shall attempt in good faith to 

promptly resolve any dispute arising under these Terms and 
Conditions by negotiations between representatives who have 
authority to settle the controversy.  If unsuccessful, Seller and 
Buyer shall further attempt in good faith to settle the dispute by 
nonbinding third-party mediation, with fees and expenses of 
such mediation apportioned equally to each side.  Any dispute 
not so resolved by negotiation or mediation may then be 
submitted to a court of competent jurisdiction in accordance 
with the terms hereof.  These procedures are the exclusive 
procedures for the resolution of all such disputes between the 
Seller and Buyer.

TERMS AND CONDITIONS AND WARRANTY INFORMATION

Summary of Contents for BADGER BA-H6

Page 1: ...BADGER FAMILY SELF ROTARY SWIVELS USER MANUAL EXCLUDES BA H6 4 40K MODEL 2 INCH 4 INCH 6 INCH PL 663 REV P 06 2020...

Page 2: ...INING RISK ASSESSMENT PPE 4 PRE RUN SAFETY CHECK 5 2 BADGER 6 MODEL AND HEAD INFORMATION 6 BACKOUT PREVENTION 7 OPERATION AND TROUBLESHOOTING 8 HEAD REPLACEMENT INFORMATION 9 ASSEMBLY AND PARTS 11 4 B...

Page 3: ...bends and comes with head locking technology for increased safety Head options allow the tool to be optimized for a variety of pump pressures and flows unplug polish or run longer lines based on jetti...

Page 4: ...s and incorporated safety features in the design StoneAge WILL NOT accept responsibility for the results of misuse IT IS THE RESPONSIBILITY OF THE INSTALLER OPERATOR to conduct a job specific risk ass...

Page 5: ...aning Always de energize the system before servicing or replacing any parts Failure to do so can result in severe injury and or death PRE RUN SAFETY CHECK Refer to WJTA IMCA s Recommended Practices Fo...

Page 6: ...the hose requirements An OPTIONAL BA 530 Fairing Assembly is available for all 2 Badger models when using hose sizes up to 6mm The fairing is designed to be attached to the back of the 2 Badger to he...

Page 7: ...BADGER BACKOUT PREVENTION WARNING Because of the short length of the Badger the tool can turn around in large lines and come back at the operator at a high rate of speed If cleaning larger lines a ri...

Page 8: ...e first time to make sure no nozzles are plugged and the jet thrust is correct The Badger should begin to slowly rotate 8 Once operating pressure is reached feed the tool into the line to begin the cl...

Page 9: ...end wrench to remove the Head from the Shaft BA 612 LK TOOL KIT INCLUDES BA 182 Head Removal Tool BA 185 Red Loctite 262 WV 010 Retaining Rings 2 WV 181 Spanner Wrench Loctite is a registered tradema...

Page 10: ...he tapered external surface of the shaft 3 Slip the Removal Tool between the Head and the Body and clamp it into a vise 4 Insert the WV 181 Spanner Wrench into the Shaft 5 Using a 7 8 socket wrench to...

Page 11: ...D C Head NEVER REMOVE SET SCREW FROM HEAD BA 501 LK Shaft BA 503 Body WV 008 O Ring WV 010 Retaining Ring BA 002 P4 15k or BA 002 BSPP4 15K or BA 502 MP6R 22K or BA 502 MP9L 22K or BA 502 MP9R 22K Inl...

Page 12: ...SET OPTIONS Engraved on each head is R12 R18 or R22 this number is the offset of the head that makes it rotate The approximate flow range for each head offset is given in the table pump operating pres...

Page 13: ...being cleaned see below Make sure there is an operator controlled dump in the system operated by the person closest to the cleaning job Follow all operating instructions in this manual DANGER If the 4...

Page 14: ...as well TROUBLE SHOOTING HIGH PRESSURE WATER SEAL LEAK The high pressure seal may leak initially at lower pressures but should pop closed as pressure is increased A continuous leak at operating press...

Page 15: ...lean lint free rags or shop towels Anti Seize Swagelok Blue Goop StoneAge PN GP 043 Blue Goop Grease Chevron Multifak EP1 StoneAge PN GP 049 Isopropyl Alcohol or Denatured Alcohol Blue Goop is a regis...

Page 16: ...nch Shaft Bearing Assembly RJ 011 C Carbide Seat RJ 012 TO H P Seal 5 Use a small screw driver or pick to remove the Retaining Ring from the shaft 6 Pull the Discs and O Rings off of the Shaft DISASSE...

Page 17: ...bearing 9 Remove both Port Plugs from the Head 10 Use a flat head screwdriver to remove the Shaft Seal and inspect for damage Figure 6 For Steps 9 10 8 Use a small pick to remove the O Ring and the S...

Page 18: ...ver the Shaft 4 Place an O Ring on top of this Disc 5 Place an Outer Disc on after the O Ring The external flats of the Outer Discs should be aligned with the flats inside the head 6 Repeat these step...

Page 19: ...nto the center of the Nut with the lip spring side up 11 Install the O Ring in the groove in the bottom of the Nut BAE 002 Nut BAE 030 Wear Ring Shaft Bearing Assembly BJ 026 Port Plug 12 Install the...

Page 20: ...026 Port Plug 1 BJ 048 F Visc Fluid Fast 6oz 1 BJ 062 S Antiseize 2g 1 BRLM 109 Bearing Single Sided 1 PL 663 BADGER Family Manual 1 RJ 011 C Carbide Seat 1 RJ 012 TO H P Seal and O Ring 1 BA 006 Seal...

Page 21: ...x Nozzle 2 x Plug 2 x Nozzle 1 x Plug 2 x Plug 2 x Nozzle Nozzles are Part Number APF4 XXX Plugs are Part Number GP 025 P4SS Once you have confirmed the required jetting configuration use the StoneAg...

Page 22: ...n around in large diameter line VERY DANGEROUS PROPER USE Badger with rigid stinger to prevent turnaround still able to pass through elbows Rigid Stinger 1 1 2 times line ID WARNING Because of the sho...

Page 23: ...e blown into the tool as well TROUBLESHOOTING HIGH PRESSURE WATER SEALS LEAK The high pressure seal may leak initially at lower pressures but should pop closed as pressure is increased A continuous le...

Page 24: ...03 Shaft Adjust Sleeve BA 301 P8 Shaft ADJUSTING SLEEVE DETAIL 1 Open End Wrench for Shaft Sleeve Adjustable Wrench to hold Shaft in place ADJUSTING THE SPEED CONTROL To adjust the speed hold the wren...

Page 25: ...ringe end into the port in the Head and squeeze fresh Viscous Fluid in until clean Viscous Fluid comes out the port in the Nut Hold the tool so the port in the Nut is the highest point If air bubbles...

Page 26: ...sc 5 BA 316 Outer Disc 4 SM 116 O Ring 3 BJ 008 O Ring 3 Figure 3 For Step 4 5 3 Remove the Seat H P Seal and Wave Spring from the bore of the Shaft Figure 1 For Steps 1 2 BA 330 Wear Ring BA 302 Nut...

Page 27: ...Sleeve in order to replace the 2 O Rings Normally it is not necessary to disassemble the Shaft from the Adjust Sleeve Figure 6 For Steps 11 13 9 Remove the Shaft Seal and inspect for damage 10 Remove...

Page 28: ...an O Ring around the outer edge of this Disc 7 Repeat steps 3 through 6 until there are four Outer Discs and five Inner Discs on Shaft Note that there is no outer O Ring on the Inner Discs at each end...

Page 29: ...BJ 026 Port Plug BJ 026 Port Plug 13 Install Shaft Seal into the bore in the Head and the O Ring over threads and into groove of Head 14 Check that the Pins are installed in the Head 12 Install Shaft...

Page 30: ...P9 SERVICE KIT FAST BA 610 P8 MP9 OVERHAUL KIT FAST BA 602 P8 MP9 H P SEAL KIT 1 BA 313 Wave Spring 1 BC 410 Syringe Assembly 1 BJ 011 C Carbide Seat 1 BJ 012 TRO H P Seal and O Ring 1 BJ 026 Port Plu...

Page 31: ...866 795 1586 WWW STONEAGETOOLS COM 31 NOTES PAGE LEFT INTENTIONALLY BLANK...

Page 32: ...NS AS TO THE PERFORMANCE OF ANY PRODUCT EXCEPT AS SET FORTH IN THE STONEAGE LIMITED WARRANTY PROVIDED WITH THE PRODUCT 4 Delivery Seller is not obligated to make delivery by a specified date but will...

Page 33: ...n with such a dispute it shall only be commenced in such courts Seller and Buyer agree to the exclusive jurisdiction of such courts and neither will raise any objection to the jurisdiction and venue o...

Page 34: ...ed by StoneAge will void this Limited Warranty StoneAge reserves the right to change or improve the material and design of the Product at any time without notice to End User and StoneAge is not obliga...

Page 35: ...AMAGES INCLUDING WITHOUT LIMITATION LOSS OF PROFITS LOSS OF GOODWILL DIMINUTION OF VALUE WORK STOPPAGE INTERRUPTION OF BUSINESS RENTAL OF SUBSTITUTE PRODUCT OR OTHER COMMERCIAL LOSS EVEN TO THE EXTENT...

Page 36: ...1 866 795 1586 www STONEAGETOOLS com 2020 StoneAge Inc All Rights Reserved...

Reviews: