background image

-  18  -

Operations

TO START--

Make sure the Dyna-Clutch lever

is in the 

STOP

 position.  If it is not, push the

lever down to the 

STOP

 position before at-

tempting to start the engine.  Open fuel valve

under fuel tank (if so equipped), open throttle

approximately half way down and apply choke.

Holding unit handle firmly with one hand, pull

the starter rope sharply with the other about (3)

times.  When engine starts, open choke and

adjust throttle as necessary to keep it running.  If

engine doesn't start after (3) pulls, open choke

slightly.

NOTE:

  These starting instructions are general

guidelines only.  Since many engine options are

available on CF Power Trowels, consult the

ENGINE MANUAL included with the unit for

specific instructions.

TO SHUT OFF

5.5 HP & 8 HP B&S ENGINES

 - close throttle

all the way, flip grounding tab against spark plug

and hold there until the engine comes to a

complete stop.

4, 5.5, 8, 11 and 13 HP HONDA ENGINES

 -

close throttle all the way and flip oil minder kill

switch to the 

OFF 

position.

4.5, 6, 9 & 11.5  HP ROBIN ENGINES

 - close

throttle all the way, depress kill switch button

and hold down until engine stops completely.

NOTE:

  These stopping instructions are general

guidelines only, consult the ENGINE MANUAL

included with the unit for specific instructions.

INITIAL OPERATION

--With engine started

as instructed previously and at operating tem-

perature, adjust speed to about half throttle.

Hold the handle firmly with one hand and move

the Dyna-Clutch lever to 

RUN

 position to

engage the trowel blades.

FLOATING OPERATION

Attach float or combination blades to the trowel

arms, and when the concrete has set sufficiently

to support the weight of the trowel, place the

unit on the concrete.  Start the unit and engage

the blades as previously instructed.  Using the

tilt adjustment knob or ProPitch™ handle,

adjust the blades to the float position--blades

should be as flat to the concrete as possible with

enough tension kept on the tilt adjustment cable

to prevent the unit from dancing or chattering.

Guide the trowel over the concrete in a circular

back and forth motion.  Under normal condi-

tions, you should be able to float a 30 x 30 foot

area in approximately 15 minutes.

This operation will bring the water and fines to

the surface, allowing for a smoother finish when

finishing the concrete.

FINISHING OPERATION

After floating, allow the concrete to set until it

will support the weight of the trowel.  Set the

pitch to approximately 1/4" to 3/8" on the

blades.  If the blades start to dig into the con-

crete, decrease the amount of pitch.

To Start/To Shut Off/Inital Op-

eration/Floating Operation/

Finishing Operation

Summary of Contents for CF24E

Page 1: ...OPERATOR MANUAL MODELS CF24E CF364 CF464 CF484 4 Blades POWER TROWEL A 100 employee owned American manufacturer REVISION E 2 2003 P N 56353...

Page 2: ......

Page 3: ...chine 14 Standard Features 15 Preparation for Service 15 Location and Use of Controls 16 Adjust Tilt Lock Nut 17 OPERATIONS 18 To Start 18 To Shut Off 18 Initial Operation 18 Floating Operation 18 Fin...

Page 4: ...roper maintenance and the use of incorrect operating materials are not covered by the warranty The above information does not extend the warranty and liability conditions of business of Stone Construc...

Page 5: ...ication to this warranty or additional warranties binding on Manufacturer Therefore additional statements whether oral or written do not constitute warranty and should not be relied upon The Manufactu...

Page 6: ...ented Dyna Clutch Reinforced contoured T handle Throttle turns w 1 4 turn locking cast iron rotating hand lift oil sight gauge assembled cushioned handgrips rotating guard 2 year gear case STONE CF364...

Page 7: ...figuration Sound Pressure CF364 5 5 Honda CF464 8 Honda CF484 11 Honda at operator s ear 92dBA 93dBA 93dBA RMS acceleration on the handle were measured per the following meter sec 2 RMS 8 27 1 5 Sound...

Page 8: ...44 Nm 3 4 16 750 315 ft lbs 427 Nm 7 8 9 875 501 ft lbs 679 Nm 1 12 1 000 746 ft lbs 1011 Nm 1 14 1 000 764 ft lbs 1036 Nm SAE GRADE 5 Coarse Thread SIZE PLATED 1 4 20 250 6 ft lbs 8 Nm 5 16 18 3125 1...

Page 9: ...Thread Fine Thread SIZE Nm ft lbs Nm ft lbs M6 14 10 14 10 M8 34 25 35 26 M10 67 49 68 50 M12 117 86 125 92 M14 185 136 192 142 M16 285 210 295 218 M20 550 406 600 443 M24 950 701 1000 738 Property Cl...

Page 10: ...10 Technical Data Hardware Key...

Page 11: ...ide an effective and safe means of finishing and meet the appropriate performance standards It is essential that the operator of the machine is ad equately trained in its safe operation be authorized...

Page 12: ...moke when refueling the engine or during any other fuel handling operation Do not refuel the unit with the engine running or while hot If fuel is spilled during refueling wipe it off from the en gine...

Page 13: ...loses control of it during operation Make sure the Dyna Clutch is disengaged lever in the down position before starting the unit Keep one hand firmly on the handle while starting and do not let go of...

Page 14: ...obtain long and trouble free use of the unit Periodic maintenance of this unit is essential Read the manual in its entirety and follow the instructions carefully Failure to do so may injure yourself o...

Page 15: ...ANDLE Can be posi tioned to provide comfort and control for any operator s height Equipped with flanged and cushioned motorcycle style hand grips to absorb vibration and minimize operator fatigue Stan...

Page 16: ...t of engine speed To use simply move the lever all the way up to the RUN position to engage the trowel blades To stop the blades from turning push the lever all the way down to STOP position In the ev...

Page 17: ...NKAGE Rod The linkage rod is fastened to a yoke end and a swivel by two nuts To adjust follow the steps listed below 1 Usingthelifteye raisethetrowelusinganoverhead crane 2 The lower end of the linkag...

Page 18: ...MANUAL included with the unit for specific instructions INITIAL OPERATION With engine started as instructed previously and at operating tem perature adjust speed to about half throttle Hold the handle...

Page 19: ...gearcase when the unit is at rest on a level sur face Add oil as required to keep oil level at cor rect height Gearcase oil should be changed ev ery 250 hours of operation or once a year which ever co...

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ...ORNIA PROPOSITION 65 WARNING Operation of this equipment and or engine exhaust from this product contains chemicals known to the State of California to cause cancer birth defects or other reproductive...

Page 24: ...Be Stone Construction Equipment Inc P O Box 150 Honeoye New York 14471 Phone 800 888 9926 Fax 585 229 2363 e mail sceny mcimail com www stone equip com A 100 employee owned American manufacturer 1984...

Reviews: