71
Assembly and setting up
7
Carry out the reference run
11. Lay the spirit level on the support surface on the right-hand side of the
needle bed.
Right support surface for the spirit level (on the right: CMS 502)
Right support surface for the spirit level (on the right: CMS 502)
12. Align the knitting machine with the grub screws.
For the subsequent mounting activities, the carriage
remains in the needle bed (until the section "Carry out
reference run").
Do not close the "Reference runs" window. It will be
necessary again in the section "Carry out the reference
run".
If the window was closed, call it up again as follows: Main
menu -> Service -> Reference runs.
Carry out the reference run