background image

 

19 | 

P a g e                              

 

 

        © 2 0 1 9   s t m   c a n n a   v 1 . 6

 

 

NOTES: 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Summary of Contents for ROCKETBOX

Page 1: ...0 P a g e 2 0 1 9 s t m c a n n a v 1 6 ROCKETBOX INSTRUCTION MANUAL Sesh Technologies Manufacturing LLC Tech Deliveries 509 204 3148 www stmcanna com...

Page 2: ...G ON THE ROCKETBOX PAGE 7 TOUCH SCREEN OPERATION PAGE 8 TOUCH SCREEN ICONS PAGE 9 USING TOUCH SCREEN MODES AUTOMATIC MODE PAGE 10 USING TOUCH SCREEN MODES MANUAL MODE PAGE 11 USING TOUCH SCREEN MODES...

Page 3: ...be visually inspected for debris Although we inspect each and every part before it is sent due to the intense vibration the break in period is required for all new hardware and plates to wear off the...

Page 4: ...ted to loading cones into empty bottom trays o ROCKETBOX AREA for trained person s to operate the RocketBox o CLOSING PACKAGING AREA dedicated to final processes of closing cones and packaging them Su...

Page 5: ...or 8 000 Hours Paper Compatibility Compatible with Industry Standard King size 1 gram 1 1 4 Size for gram cones Volume Capacity 453 Pre Rolled Joints Per Run Product Loss During Use Minimal Material L...

Page 6: ...Use the nuts at the top of the feet to adjust and level it Step 4 Insert the bottom tray into Loading Box LOADING UNLOADING CONES LOADING CONES Step 1 When loading cones push in the knob on the right...

Page 7: ...rgency you can push in the E STOP button to quickly shut down the machine GOOD PRACTICES Pre weigh your material with an overfill of 20 30 prior to cycle Consistency should match that of a personal ha...

Page 8: ...g for a specific period of time You have complete control over every setting ___________________________________________________________________________ Each Stage Can Be Customized By Desired power o...

Page 9: ...This section has functions that control the power of the shaking motor and the pneumatic leveling system HOUSE ICON MAIN HOME SCREEN The HOUSE icon is for the main home screen This is the main home sc...

Page 10: ...mple This is the 3 Stage Automatic Preset Mode Detailed on Page 6 Step 1 Click on the Gears Icon Step 2 Click on 1 Sample mode This is the default 3 stage mode Step 3 Click on the Gear Icon again to s...

Page 11: ...he pneumatic leveling system The higher the PSI number the tighter the pack We recommend starting at 80 PSI The right side settings adjust the motor speed which controls the amount of vibration The hi...

Page 12: ...Stage 2 could be a harder pack at a higher motor speed for 20 seconds Then Stage 3 a lower motor speed for a dampening pack Step 4 Click Back Arrow Step 5 On Preset Screen click on a Number to store...

Page 13: ...and to 20 PSI before adding any material You can add material before or after you press the go button depending on what your pre set functions are Eventually you can turn it up to 80 PSI to get a goo...

Page 14: ...each end of the trays Step 4 Load tray into loading unloading station REMOVING FINAL PRODUCT Step 1 Ensure the loading box is in the unloading position black knob on side is pulled out prior to placi...

Page 15: ...ng regular soap and water and rinsing off removing all residue To clean stainless steel use isopropyl alcohol and a soft cloth Wet the rag with the isopropyl alcohol and wipe down all areas thoroughly...

Page 16: ...paperclip to unplug the holes as it fills It also helps to sometimes loosen each handle on the top tray to get more vibration during use How do I get a better fill rate Fill rate will depend on a vari...

Page 17: ...through a dealer distributor not authorized for your country will not be supported by this warranty Electrical parts are not covered under warranty Extent of Warranty Any STM system properly returned...

Page 18: ...erviced accordingly where the shipment date may be sooner than originally quoted We will ship by the most reasonable means based on the volume of the order unless otherwise specified Special Orders Al...

Page 19: ...will need to place in and on the package After receiving your RMA you may send the item to STM 3223 North Market St Spokane WA 99207 Upon receipt of the returned product we will fully examine it and n...

Page 20: ...19 P a g e 2 0 1 9 s t m c a n n a v 1 6 NOTES...

Reviews: