21 |
P a g e
STEP 4.0
ROOF FRAME ASSEMBLY
4.0 - ASSEMBLY PARTS
–
ROOF ASSEMBLY (REPEAT TWICE)
PART CODE QTY
DESCRIPTION
REP
2
Roof End Plate 1714x70x45mm
R
3
Roof Rafter 1195x70x45mm
75BS
12
75mm Batten Screw
4.0- ASSEMBLY
–
ROOF ASSEMBLY (1 of 2 frames)
It helps to find a flat, level surface to complete this process on.
1. Place 3x Roof Rafters (R) in between REPs as seen in diagram above and screw 75BS into
predrilled holes to assemble roof frame.
Repeat this twice.
REPEAT THIS ASSEMBLY PROCESS TWICE TO COMPLETE BOTH ROOF
FRAMES READY FOR ROOF SHEETING
Summary of Contents for Hyland S3015
Page 43: ...42 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Page 44: ...43 P a g e ...
Page 45: ...44 P a g e ...
Page 46: ...45 P a g e ...
Page 47: ...46 P a g e ...
Page 48: ...47 P a g e ...
Page 49: ...48 P a g e ...
Page 50: ...49 P a g e ...