8 |
P a g e
STEP 2.0
WALL ASSEMBLY
2.0 - ASSEMBLY PARTS
–
WALL ASSEMBLY
PART CODE QTY
DESCRIPTION
FP
1
Front wall panel
P
1
Wall panel
65HHS
3
65mm Hex head screw
–
If optional window was purchased, it can take the place of any 900mm (P) panel.
1.0
- ASSEMBLY
–
WALL ASSEMBLY
Screw through FP into P (top, centre & bottom) using 3 x 65HHS. (Holding studs flush on the
outside
)
Note: Ensure tongue on VJ cladding is facing upwards on all panels.
P
Screw 3 x 65HHS (Top,
centre & bottom)
FP
Cedar Strip
When screwing the four corners together please make sure the studs are flush on the
outside (not the inside) as per image below.
Summary of Contents for Hyland S3015
Page 43: ...42 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Page 44: ...43 P a g e ...
Page 45: ...44 P a g e ...
Page 46: ...45 P a g e ...
Page 47: ...46 P a g e ...
Page 48: ...47 P a g e ...
Page 49: ...48 P a g e ...
Page 50: ...49 P a g e ...