18 |
P a g e
STEP 3.0
FRONT END GABLE ASSEMBLY
3.0 - ASSEMBLY PARTS
–
FRONT END GABLE ASSEMBLY
PART CODE QTY
DESCRIPTION
G
2
8ft Gable (left and right)
SCS
1 & 1
Stilla Cover Strip (1@1800mm, 1@ 600mm)
FGS
1
460mm Front Gable Cover Strip
65HHS
2
65mm Hex head screw
40N
15
40mm Nail
3.0
- ASSEMBLY
–
FRONT END GABLE ASSEMBLY
Lay left and right gables (G) on a flat surface with the frame facing upwards, as seen
below. Hold flush at the bottom and screw together in position shown below using 2x
65HHS.
Turn fastened gable over with the cedar now facing upwards. Position SCS (1800 & 600
pieces) flush at each end and flush with bottom of gable cedar cladding. Hold in place and
using 10x 40N spaced evenly, nail to gable through cover strip. Position FGS over join in
gable, holding bottom flush with top of SCS and nail using 5x 40N.
Lay Gables on flat surface
Hold SCS flush at each end
and flush with bottom
Position FGS over join and hold
bottom flush with top of SCS
Summary of Contents for Hyland S3015
Page 43: ...42 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Page 44: ...43 P a g e ...
Page 45: ...44 P a g e ...
Page 46: ...45 P a g e ...
Page 47: ...46 P a g e ...
Page 48: ...47 P a g e ...
Page 49: ...48 P a g e ...
Page 50: ...49 P a g e ...