6
Maintenance
Preparation for maintenance
1044_001-003
1
3
2
Removing the bonnet
The bonnet must be removed before servic-
ing. Proceed as follows:
– Remove 2 screws (1) and (2).
– Remove the bonnet (3).
CAUTION
Do not damage electric cables.
1044_001-004
1
2
3
Installing the bonnet
– Install the bonnet (3) from above with the
guiding lugs (1) in the openings (2) in the
frame.
– Fasten the bonnet with 2 screws from
above.
100
4 499 284 [EN]
Summary of Contents for CX-M 10
Page 1: ...Operating Instructions Floor level order picker CX M 10 1045 Ident no 4 499 284 08 09 EN ...
Page 2: ......
Page 9: ...1 Foreword ...
Page 17: ...2 Introduction ...
Page 24: ...2 Introduction Residual risks 16 4 499 284 EN ...
Page 25: ...3 Safety ...
Page 38: ...3 Safety Emissions 30 4 499 284 EN ...
Page 39: ...4 Overviews ...
Page 46: ...4 Overviews Options and variants 38 4 499 284 EN ...
Page 47: ...5 Operation ...
Page 98: ...5 Operation Storage 90 4 499 284 EN ...
Page 99: ...6 Maintenance ...
Page 124: ...6 Maintenance Maintenance every 500 hours 116 4 499 284 EN ...
Page 132: ...6 Maintenance Maintenance every 5000 hours 124 4 499 284 EN ...
Page 133: ...7 Technical data ...
Page 134: ...7 Technical data Dimensions Dimensions 126 4 499 284 EN ...
Page 141: ......
Page 142: ...Still GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 4 499 284 EN ...
Page 144: ......
Page 145: ...8 Diagrams ...
Page 146: ...8 Diagrams Hydraulic system Hydraulic system Hydraulic diagram 138 4 499 284 EN ...
Page 149: ...Diagrams 8 Electrical system Circuit diagram Driving platform option 4 499 284 EN 141 ...
Page 152: ...Still GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 4 499 284 EN ...