INSTALLATION
FIRST START-UP
Steam pipe installation
The condensation chamber prevents steam from escaping. On
malfunction, the steam must be removed by a pipe. The owner
must install a steam pipe for this purpose.
Risk of injury!
The steam pipe fitted by the customer may not be sealed
off!
If a drain funnel is used, the steam pipe must end 20 mm
above the funnel!
»
For surface-mounting, slide the fast connector (straight)
along the steam pipe connection up to the stop (approx.
28 mm (Optional the fast connector (90°) for concealed
connection).
»
Assemble the steam pipe and insert in the fast connector up
to the stop.
»
The steam pipe must be conveyed across a drain funnel or
coil on installation.
9.5 Electrical
connection
Electrical connections may be fastened to a permanently fitted
pipe only, using the built-in cable clip. The unit is designed for
an AC main and must be separable from the main with a break of
at least 3 mm all-pole, e.g. by fuses.
100
2
6
_0
2_0
4
_0
1
1
0
»
Prepare electrical connection line.
»
Connect up the unit in accordance with wiring diagram (see
chapter "Specification / Wiring diagram").
An on/off switch may optionally be installed by the
owner.
10. First start-up
Automatic start-up mode:
- Fill / Heat up periodically
- Total time approx. 50 min.
»
Open cold water inlet to the unit.
»
Switch on mains voltage.
The unit is automatically filled through the magnetic valve
and the heating process starts.
»
Check connection tightness.
»
Fit lower cover and fasten with 3 screws.
»
Check unit operation.
ON lights up
- unit operative.
READY flashes
- automatic heating up up to boiling point (Time approx. 50
minutes). Automaticboiling point detection is undertaken.
- Do not draw water during boiling pointdetection as the proc-
ess will otherwiserecommence from the start (automatic).
READY lights up
- Boiling wateravailable
- Start-up mode has ended.
»
Allow contents to run off (unit rinse).
11. Handing over the unit
»
Explain unit operation to the user and familiarise with use.
»
Point out possible risks to the user (scalding).
»
Hand over these instructions for careful safekeeping.