24
Pos: 56 /Technische Dokumentation/Überschriften/Inbetriebnahme @ 0\mod_1377173015559_567.docx @ 592 @
7 Com
Pos: 57 /Technische Dokumentation/Überschriften/Vorbereitende Maßnahmen @ 0\mod_1377697298577_567.doc
7.1 Pre
Pos: 58 /STG-BEIKIRCH Technische Dokumentation/Vorbereitende Maßnahmen STG/Vorbereitende Maßnahmen
Before comm
•
External
7.2 Ins
Fig.: 19 Insertin
1 FKS
4
Fig.: 20 Installi
1 Accum
2 Hexag
►
Turn on
►
The drive
1 @ 1
mmission
cx @ 644 @ 2 @ 1
eparatory
MZ3 @ 1\mod_1460536341199_567.docx @ 14666 @ 2 @ 1
missioning the
components
stalling the
ng the fuse in the
40 A fuse
ng the accumula
mulators
gon screw
the mains
es must not m
Article-
ning
measures
MZ3 modular
Note
If external c
modular con
are installed a
e accumul
e fuse holder
ators
move.
-no.: 1342499
s
r control panel
omponents ar
ntrol panel.
and correctly c
lators
99549
l, the following
re not connect
connected.
►
2
►
3
Date: 0
g installation w
ted correctly, t
Insert fuse in
Cable bridge
Place the acc
provided and
Cautio
Accumu
hours p
Mounting br
04.11.2016
work must be c
this can cause
the fuse hold
e with fuse ho
cumulators at
fix in place w
n
ulators must b
prior to commis
racket
completed and
e malfunctions
der and close.
older
the installatio
with the holding
be charged for
ssioning.
Version: 1.7
d checked:
s of the MZ3
n position
g brackets
r min. 8
7