55
Article-
-no.: 134249999549
Con
►
►
Read
►
►
►
►
►
►
►
Date: 0
necting the s
Insert the RJ
module.
Connect the U
ding the new
Start the MZ3
Click the "Cle
Confirm with
An 8 and a ci
can take a few
Wait until the
Confirm with
Load the requ
Click the "Wr
Wait until the
appear on the
Wait until the
03.11.2016
service port
plug in the so
USB plug to th
configuratio
3 tool in config
ear" button.
"Yes"
rculating bar a
w minutes.
process has c
"No".
uired configura
ite" button.
8 and the circ
e display.
process has c
ocket of the ma
he PC.
on
guration mode
appears. This
completed.
ation.
culating bar no
completed.
Version: 1.7
aster
e.
process
o longer
7