
Fuselage Construction Cont.
☐
Route plastic push-rod housing through
formers F4, F5, and opened slot in F7.
☐
Push-rod housing extends forward of F4 by
1/8 in., trim excess housing flush with F7.
☐
Cut 10.5mm paper tube to 3-1/2 in. length.
☐
Install tube between formers F4 and F5.
☐
Assemble H1 hatch component from H1a /
H1b.
☐
Bond H2 over vent hole centered to etch
marks along H1. Use thick CA glue.
FREDe © 2009 Stevens AeroModel all rights reserved.
Page 14 of 32