6
STEP 1 – INSTALLING THE FLUSH VALVE
6
Turn on the water supply. Make
sure there is no leakage.
7
Assemble the mud guard cover
to protect the flush valve.
Note the MIN and MAX marks
on the box.
STEP 2 – CONNECTING THE POWER SOURCE
1
Once the electricity, plumbing
and tile works are finished, cut
the mud guard cover wherever
required by the installation.
INSTALLATION
MIN
MAX