5
BEFORE YOU BEGIN
INITIAL INSTALLATION CONSIDERATIONS
IMPORTANT TO THE OWNER
We recommend a certified Sterisil
®
installer, professional technician, or plumber familiar with dental offices
perform the installation since interfacing with a cold water line and drain is involved. He/she should be familiar
with local plumbing codes and techniques for successful dental equipment installations.
Please keep the installation and maintenance manual on-hand for future reference. Ensure those responsible
for operation and maintenance of the system is familiar with all details contained in this manual. Please return
the warranty registration form via mail or register online at sterisil.com/warranty immediately upon installation.
The Sterisil
®
System G5 unit requires power to produce water. In the event of a power outage, water will still be
dispensed but will not be replenished until power is restored.
IMPORTANT TO THE INSTALLER
Please read the entire installation and maintenance manual and watch the installation video at sterisil.com/sterisil-
system-g5 before proceeding with the installation and initial operation. Always follow local plumbing codes and
municipal regulations. Familiarize yourself with the G5 drawings and diagrams included.
The G5 can be installed nearly anywhere in the typical dental, medical, lab, or hospital setting, typically near a
faucet and sink. The system and tanks are designed to fit under a counter-top, but can be installed anywhere
there is a quality, cold water supply and drain connection. Please locate the system serial label on the left panel
of the unit or go to the settings tab on the touchscreen. Record the installation date on the warranty card. Please
ensure you send in the warranty card or register online.
The initial set up can take up to 3–5 hours depending on customer specifications. Ensure the lengths of tubing
provided will meet the needs of your specific configuration. All tubing cuts should be made at a right angle to
the tubing itself. Be sure to inspect the ends for burrs before establishing a connection.
®
®
PLAN NOTES
12
13
1
2
3
8
9
6
7
4
5
10
1
2
3
11
1/4” inline ball valve
13
®
®
PLAN NOTES
8
9
6
7
4
5
10
1
2
3
11
12
13
1/4” inline ball valve
13
INITIAL SETUP AND BASELINE
REQUIREMENTS
For the system to fit functionally in its mounting, it
will require at least:
• 27” in height
• 24” in length
• 11” in depth
These dimensions allows 2” of space on all sides of the system.
Direct Feed Specific Requirements
Dental Water
Supply Tubing:
(Customer Supplied)
• Centrally installed within the
dental office, furthest chair should
not exceed 50’ from the system
• Recommended use of PVC APEX
A FIRE Rated tubing
• No brass or copper plumbing
components may be used
downstream of the system
Source Water
Bypass:
(Customer Supplied)
A source water bypass should be
installed by a plumber or technician
to bypass the System if necessary.
General Sterisil
®
System G5 Requirements
Minimum Pressure
60 PSI
Maximum Pressure
125 PSI
Minimum Temperature
45 °F
Maximum Temperature
100°F
Plumbing Drain
Standard sink or floor drain
Electrical and Internet
Connectivity
Double outlet 110V AC, 3
amp, GFCI, within 5’ from
System, Wi-Fi or Ethernet
connection.
Wi-Fi signal strength should be tested
before installing the System.
Bladder Tank
Space
Tank 2G: 9”Dia x 12”H
Tank 4G: 12”Dia x 15”H
Tank 10G: 13”Dia x 21”H
Tank 14G: 15.25”Dia x 23”H
Internet Enabled
Computer
PC or Mac