2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415
SteppIR Antennas - 4 Element
2
Topic Page
4E Yagi check list
3
Bill of materials for assembly kits
4-5
SteppIR acronyms
6
SteppIR—Why Compromise?
7
SteppIR Design
8
Assembling the boom
9-11
Connecting the mast plate to the boom
11-12
Wiring the EHU’s
13
Connecting the control cable to the dSub splice
14-15
Attach the lid to the EHU’s
16
Mounting the EHU’s to the boom element brackets
17
Connecting the control cable to the terminal strips
18-20
Preparing the telescoping poles
21
Waterproofing the pole joints using polyolefin heat shrink
22
Attach the foam plugs to the telescoping pole tips
23
Secure the telescoping poles to the EHU’s
24-25
Install the OPTIONAL 6m passive element kit
25-26
Install the boom truss assembly
26-27
SteppIR Performance
28-30
Options for your SteppIR Yagi
31-32
Limited Warranty
33
Specifications
34
Summary of Contents for 4 Element Yagi
Page 13: ...SteppIR Antennas 4 Element 13 ...
Page 14: ...SteppIR Antennas 4 Element 14 CONNECTING THE CONTROL CABLE TO THE D25 SPLICE ...
Page 15: ...SteppIR Antennas 4 Element 15 ...
Page 16: ...SteppIR Antennas 4 Element 16 ...
Page 34: ...SteppIR Antennas 4 Element 34 ...
Page 35: ......