20
www.stenner.com
Econ T
INSTALLATION
continued
4.
Hand tighten the injection fitting into the FNPT fitting.
a.
Install connecting nut and ferrule to the pump discharge tubing. Insert discharge
tubing into injection fitting until it reaches base of fitting.
b.
Finger tighten connecting nut to fitting.
5.
Turn the pump on and re-pressurize the system. Prime the pump and observe the
flow. Check all connections for leaks. Once primed, place the pump in the desired
operating mode.
6.
After suitable amount of dosing time, perform tests for desired readings (e.g., pH or
ppm). If necessary, fine tune dosing levels by adjusting the run time per event.
The injection point and fitting require periodic maintenance to clean any deposits
or buildup. To allow quick access to the point of injection, Stenner recommends
the installation of shut-off valves.
Summary of Contents for E10T1A
Page 1: ...ECON SERIES T PUMP INSTALLATION AND MAINTENANCE MANUAL PERISTALTIC METERING PUMPS SINCE 1957 ...
Page 30: ...30 www stenner com Econ T FOR YOUR RECORDS Model Serial Number Date of Installation ...
Page 31: ...31 USA and Canada 800 683 2378 International 904 641 1666 Econ T MOUNTING TEMPLATE ...
Page 62: ...30 www stenner com Econ T PARA SU REGISTRO Modelo Número de Serial Fecha de instalación ...
Page 63: ...31 EE UU y Canadá 1 800 683 2378 Internacional 1 904 641 1666 Econ T PLANTILLA DE MONTAJE ...