
INS_CXL58-AF Rev D
Page 58
24 - LPC - CXL CONVERSION KIT INSTRUCTIONS
[>$\"!$J[[>``'9$>`J@'*
technician or the gas supplier.
1. *YY/':'$**/#
(Figure 19J).
2. Q!
3. $!h
G. TESTING FOR LEAKS.
NOTE: The appliance and its individual shutoff valve must be disconnected from the gas supply piping system during any
pressure testing of that system at pressures in excess of 1/2 psi. The appliance must be isolated from the gas supply piping
system by closing its individual manual shutoff valve during any pressure testing of the gas line at test pressures equal to or
less than 1/2 psi (3.5 kPa).
[>$\{"!"
disappear after several seconds.
IMPORTANT NOTICE: Pressure check taps for the manifold (outgoing) and inlet (incoming) pressure have been incorporated
into the valve. The pressure tap marked "OUT" measures outgoing pressure and the pressure tap marked "IN" measures
incoming pressure. Follow instructions below for proper testing procedures.
NOTE: If inlet pressure reading is too high or too low, contact the gas company
>"
H. INLET PRESSURE TEST
1. *mY$'Ynm>n
2. :Vj^Y$#
3. *
'
4.
5. #mn
>
6. ,>>
7. ,>
8. &
WARNING: A LOW PRESSURE READING CAN CAUSE DELAYED IGNITION.
►
►
OUTLET (MANIFOLD)
PRESSURE SCREW
INLET PRESSURE
SCREW
Figure 24H
f i r e - p a r t s . c o m