![Stellar Hearth CML-58-AF Installation And Operating Instructions Manual Download Page 22](http://html1.mh-extra.com/html/stellar-hearth/cml-58-af/cml-58-af_installation-and-operating-instructions-manual_1371577022.webp)
INS_CXL58-AF Rev D
Page 22
D. WALL PASS-THROUGH
EXISTING CEILING JOISTS
NEW FRAMING
CEILING BELOW
B
A
▲
►
▼
◄
◄
▲
▲
►
►
►
A
B
NAILS, 4 REQUIRED
CEILING FIRESTOP
▲
►
▼
◄
◄
▲
NAILS, 4 REQUIRED
CEILING FIRESTOP
A
B
▲
►
▼
◄
◄
▼
If the area above the ceiling is an attic space,
">[$>@
Figure 11D
If the area above the ceiling is not an attic space,
"*[9
of the framed hole.
A = 9" (268mm) B = 9" (268mm)
A = 9" (268mm) B = 9" (268mm)
A = 9" (268mm) B = 9" (268mm)
NAILS, 4 REQUIRED
A
B
▲
►
▼
◄
◄
▼
WALL THIMBLE
Position the wall
thimble on the INSIDE
of the framed hole.
A = 10" (254mm) B = 10" (254mm)
11 - VENTING
NOTE: M & G DURAVENT 46DVA-WT WITH HEAT SHIELD OR DURAVENT VERTICAL 46DVA-FS WALL PASS-THRU (OR SELKIRK
EQUIVALENT) MUST BE USED ON ALL HORIZONTAL VENT TERMINATIONS. THIS INCLUDES BOTH INTERIOR AND EXTERIOR
WALLS. FOLLOW INSTRUCTIONS BELOW.