Tools Required
Wrench: 9/16” , 7/16”, 1/2”
Ratchet
Socket: 916”, 7/16”
Pliers
Allen Key
Axle Stands
Refer to parts breakdown section for parts identification
.
STEP 1
Snowblower Preparation:
1. Remove the snowblower from te shipping crate.
2. Remove the support plates from skid shoes.
7
ASSEMBLY INSTRUCTIONS
Chute Installation:
NOTE:
This step requires two people.
1. Wrap the rotation ring (item 1) (groove inside)
around the edge of the discharge chute (item 2) as
shown.
2. Place the chute (item 3) (opening facing forward)
over the rotation ring.
IMPORTANT
: The ring must be inside the base
of the chute. It is the chute that will hold the
rotation ring in place.
3. On the right side of snowblower, install the
grooved rotation ring (item 4) under the chute as
shown.
4. Secure the chute and rotation ring in place with six
hex bolts 1/4’’ x 1 1/4’’ (item 5) and nuts as shown.
Do not tighten too firmly.
5. On the left side of the snowblower, install the other
half of rotation ring (item 6) under the chute as
shown.
6. Secure the chute and rotation ring in place with
three hex bolts 1/4’’ x 1 1/4’’ (item 7) and nuts (as
shown). Do not tighten the nuts too firmly.
(Nuts that are too tight might prevent the chute from ro-
tating side to side. Only a slight pressure is necessary).
Summary of Contents for 75-71231
Page 2: ...2 ...
Page 18: ...PARTS SECTION PARTS SECTION 16 ...
Page 19: ...17 O L Obtain Locally ...
Page 20: ...18 ...
Page 21: ...19 O L Obtain Locally ...
Page 22: ...20 O L Obtain Locally ...
Page 23: ...21 O L Obtain Locally ...
Page 24: ...22 O L Obtain Locally ...
Page 25: ...23 O L Obtain Locally ...
Page 26: ...24 ...
Page 27: ...25 O L Obtain Locally ...