14
STEIN300_Hubzentriereinrichtung_HZEV_03_GB.DOC_D / 02.2020
5.2
Preparation
DANGER
Due to the Workpiece Transport System starting unexpectedly.
DANGER
HIGH ELECTRICAL VOLTAGE!
Electric shock hazard!
1 Before carrying out any installation or repair work, disconnect the relevant
Workpiece Transport System from its electrical power supply.
2 Disconnect the workpiece transport system from its compressed air supply.
3 Put up warning signs to prevent the system from being started up while installation
and repair work is being done.
4 Remove any workpiece carriers located on the affected belt element.
5.3
Installing the HZEV between the two belt profiles
Protective clothing must be worn!
Wear your personal safety clothing:
Safety footwear and safety gloves.
ATTENTION!
If larger than 320 mm then two people will be required to install the HZEV.
i
Observe the installation dimensions in fig. 5-4.
Fig. 5-2:
Inserting the HZEV
Nutenstein
Schraube
Profil