![background image](http://html1.mh-extra.com/html/stealth/digi-arc-160lt/digi-arc-160lt_operators-manual_1368253007.webp)
STEALTH DIGI-ARC 160LT
7
5. OPERATION CONTROL AND CONNECTORS
6
5.
Operation control and connectors.
(1)
Positive output: Connect the welding the clamp.
(2)
Negative output: Connect to pliers.
(3)
Welding current adjustment knob: Turn this knob to adjust the output current size.
(4)
Power indicator: power indicator, power on light on.
(5)
Alarm light: alarm indicator, lights that occurred under voltage or overheating
inside the machine, is protected.
(6)
Current digital display
(7)
Power switch: control power through and break.
(8)
Fan: Help plant cooling.
(9)
Power Access client: access to cable.
(10)
Conversion switch: choose LIFT TIG; choose MMA.
6.
Installation & Adjustment
Note: Please follow steps in strictly accordance with installation!
Electrical connection operation must be shut after power distribution box power
switch!
The equipment protection level is IP23. Do not use it in the rain!
6.1
Installation
(1) Each machine is equipped with a power cable should be based on the input
voltage welding power cable connected to the appropriate position, not to pick the wrong
voltage.
(2)With the corresponding input power supply terminal or socket good contact and
prevent oxidation.
(3)With a multi meter measure the input voltage is within the fluctuation range.
1 Positive output: connect welding to the clamp.
2 Negative output: connect to pliers.
3 Welding current adjustment knob: turn to adjust the output current size.
4 Power indicator: power-on light.
5 Alarm light: indicator light comes if voltage or overheating occurs inside the machine.
6 Current digital display.
7 Power switch: power on and power off.
8 Fan: assists cooling.
9 Power access client: access to cable.
10 Conversion switch: choose LIFT TIG; choose MMA.