Place two S8 pins in the center of the two rivets in
the top of each panel. Hammer the pins until flush
and the collar is secured to the panels.
Place S8 pins in the center of the three rivets along
the left side of each panel and hammer until flush.
Turn the half sphere over.
Assemble One Half Sphere (Continued)
D
E
F
NOTE: Hammer pin until it is flush with the top of the
rivet and the rivet is flush with the hole in the panel.
NOTE: Hammer pin until it is flush with the top of the
rivet and the rivet is flush with the hole in the panel.
Step 4:
www.ecomposter.net
6 of 18