30 / 44
www.stcny.com
8.3
G03G
P19
P19
8.4
G03G
G03Y
S20
G03J
S20
G03Y
!
G03J
G03H
S20
S20
S20
S20
S20
S20
S20
G03E
G03E
G03E
G03Y
G03J
G03G
G03H
G03Z
G03Z
G03E
S20
G03H
P19
P19
G03H
G03G
From the inside of the greenhouse, use two people to carefully lower center gable onto frame.
Line up and slide profiles G03H and G03G into connectors P19 until they click securely into place.
From the inside of the greenhouse, use two people to carefully lower front and back gables onto
frame. Line up and slide connectors S20 into channels of profiles G03E, G03J, G03Y and G03Z.
IMPORTANT: U-shaped cutouts on
profiles G03Y and G03J face the FRONT.
NOTE: One egede of profiles G03E, G03J, G03Y and G03Z are shaped. Stickers with
arrows are placed on that edge and point DOWN when profiles are installed.
IMPORTANT: U-shaped cutouts on
profiles G03H and G03G face the BACK.
Connectors P19 CLICK into place.
NOTE: One edge of profiles G03H and G03G are
shaped. Stickers with arrows are placed on that
edge and point DOWN when profiles are installed.
Summary of Contents for Easy Grow 6x12 Greenhouse
Page 46: ...Notes...