43 / 45
www.stcny.com
#S35
#S34
10
10
!
14
S35
S34
G01D
G01D
Secure to Ground
From the inside of the greenhouse, insert the S34 anchor clips
sides. Place the S35 pegs through the holes and into the ground to establish proper
the concrete is partially dry, use a hammer to drive the pegs all the way into the
concrete and let dry completely for twenty four hours.
QTY
Anchor Peg
QTY
Anchor Clip
Make sure the foundation is FLAT and LEVEL. Make sure the greenhouse
is square. The two diagonal measurements inside the greenhouse should
be identical.
G01D at a slight angle and slide under the lip of the channel.
VIEW FROM INSIDE.
Summary of Contents for Easy Grow 6x12 Greenhouse
Page 46: ...Notes...