7 / 44
www.stcny.com
1.3C
1.3D
S29
S30
S31
S31
G13C
1.3B
1.3A
2
4
2
2
#S29
#S30
#S31
#S33
#S44
2
S44
G13C
S33
G13C
1.2
2
#G15A
S14
G13B
G15A
DOOR 3
G13B
G13A
S52
G13A
brace until all holes line up. Brace will dip slightly when hex bolt is secured.
G13C
NOTE: Connectors packaged as Door Handle Kit.
Slide hairpin clip S44 into groove on pin S29 to
hold securely in place.
Hook one side of spring S33 into hole on handle S30.
Repeat steps 1.2 through 1.3C
to complete second door.
Open door handle kit and remove parts. Slide pin S29 through handle
QTY
QTY
Connector
Connector
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
Brace
Place brace G15A onto DOOR 3 lining up the holes on each end with the holes in
brace with two S52 screws and S14 hex nut.
IMPORTANT: The hole for hex bolt is not at the midpoint of brace. Turn
Summary of Contents for Easy Grow 6x12 Greenhouse
Page 46: ...Notes...