15
www.staufenbiel-shop.com
+49 40 30061950
EN
The control rods of the ailerons are preassem-
bled at the factory. Nevertheless, we recom-
mend checking all screw connections and
securing them with Loctite if necessary. Also use
a servo-tester to check whether the servos are in
the neutral position, as illustrated. If the rudder
area is now not neutral, the linkage lengths
must be adjusted.
Hook-in position of the aileron linkage:
Rudder - outermost
Servo - second hole from outside
5
Now connect the two landing flaps, aileron
and landing gear with the enclosed Y-cables.
If there are enough channels at the receiver,
you can also dispense with the Y-cables, in
order to be able to trim the individual servos
more precisely. In this case, however, mixers
need to be programmed for all functions.
4a
Stow the Y-cables in the wing and make sure
that about 10-15 cm servo-cables protrude on
the right side in the direction of flight. Fasten the
cables with adhesive tape as shown in the figure.
4b
Check the screw connections of the landing
flap linkage as described above. Move the
servos of the landing flaps using a servo-tester
into a 45° position (to the end strip).
The linkage length now has to be adjusted, so
that the landing flaps are fully retracted in this
position.
Hook-in position of the landing flap linkage:
Rudder - outermost
Servo - second hole from outside
6
Summary of Contents for Yak 11
Page 1: ...MONTAGE ANLEITUNG INSTRUCTIONS MANUAL MANUEL D UTILISATION...
Page 32: ......