background image

 

 

Figure 3-2-2 
Supporting  STARFIRE  SF-2012AH  cutting  machine  CNC  system  wiring 
diagram. 

Table 3-2-3 4 cores sub - plasma power supply

 

No. 

Character 

Illustration 

Remark 

24V+ 

Power 

Points linking piece 24V power 

positive supply   

Never to use others 

VOL INT 

Input 

After points linking piece action, 

the voltage input 

 

ARCOUT 

Output 

Output to points linking piece of 

signal of the arc 

 

24V- 

Power 

Points linking piece 24V power 

supply ground 

 

 

Note: the arc output need to use an intermediate relay output, is included in the 
matching points on the pressure plate. 

Summary of Contents for SF-HC25G

Page 1: ...SF HC25G Cutting torch height controller The user manualV1 2 http www starfcnc com 44 206...

Page 2: ...ctrical installation connect 4 Parameters illustration 5 Use guide 5 1 Manual operation 5 2Automatic operation 6 CNC system and block adjustment for M instructions 6 1 CNC system control direct output...

Page 3: ...torch between nozzle and the distance heighten of cutting board is very important to the stability it will directly affect the cutting speed and the quality of the incision Main engine Display settin...

Page 4: ...fore install anduse this product must be strictly carried out in accordance with the details of the product system manual operation in order to ensure the correct use of the product About SF HC25G pla...

Page 5: ...nsure the accuracy of the height control Please careful carry away and please do not intense collision vibration in order to avoid damage to the product Please don not do something without authorizati...

Page 6: ...d adjustable of level 255 control of motor speedprecise several current setting short circuit protection Cutting with the function of collision When cut lips touch the steel plate the controller can q...

Page 7: ...temperature 10 60 Weight 0 6 Kg Detection system isolation of arc electric subsection platen B2 type 3 Installation 3 1 Installation The related parts name of height controller location components ar...

Page 8: ...1 4 communication line Bottom highly controller of the four M4 screw hole used for fixed box body onto the mounting plate Its size is shown in figure 3 1 5 You can also use DZ47 type guide rail insta...

Page 9: ...Figure 3 1 5 Display setting panel uses two M4 screw to install installation dimensions such as figure 3 1 6 Figure 3 1 6...

Page 10: ...nect 3 2 1 interface definition description Table 3 2 1connect lifting mechanism No Character Illustration Remark MOT Output Lifting motor MOT Output Lifting motor 24V Output For 3 lines close to the...

Page 11: ...nect NC system power negative of output connection 0 OK Output After start arc to feedback signal Output as 0V DOW Input Manual decline signal connect NC decline output signal Low effective UP Input M...

Page 12: ...Points linking piece 24V power positive supply Never to use others VOL INT Input After points linking piece action the voltage input ARCOUT Output Output to points linking piece of signal of the arc 2...

Page 13: ...n introduced Points linking piece is after the plasma cutting torch arcing voltage according to certain proportion is reduced and according to the isolation of converted to reflect the cutting nozzle...

Page 14: ...nt potentiometer factory of 50 1 try not to adjust 24V Positive Start arc control Partial pressure output 24V ground 9 core outlet 9 4 6 2 5 Screw terminal 24 ST V 24 4 Parameters shows There are thre...

Page 15: ...ent too It should be set according to the actual situation Clockwise rotation for higher position height counterclockwise to reduce positioning height 4 The speed parameters the parameters for debuggi...

Page 16: ...igital tube display not normal or up and down limit indicator lamp lights up at the same time and cannot perform any action Self checking by into working state and working state is divided into two ki...

Page 17: ...ignment is complete Start arc output after the completion of the initial positioning output and arc signal to the plasma power such as waiting for a time after acquisition of arc voltage Start arc suc...

Page 18: ...rom 0 no there is no any arc pressure delayed perforation delay seconds 4 If the parameter is set in the arc pressure detection choose 1 testing arc pressure measurement waiting for the starting arc s...

Page 19: ...el communication line To reconnect or replace communication line Above limit alarm lights Running more than mechanical upper limit Check the high limit switch Lower limit alarm lights Running more tha...

Page 20: ...8 Appendix 2LineNPN normal shut series connection method 2 Line NPN normal open parallel methods 3LineNPN normal shut series connection method 3 Line NPN normal open parallel methods...

Page 21: ...FIRE control technology co LTD Address HAITE garden 204 44 floors Shi Jing Shan district Beijing city Zip code 100041 Sales 010 88909875 Technical support 010 88797100 Website http www starfcnc com E...

Reviews: