Daily Maintenance
During the working season the following daily maintenance should be carried out.
Check all covers and guards are in position, free from damage. Repair or replace any
found to be defective before operating the machine.
Carry out the following checklist: -
1.
Check tension of all drive chains, adjust if necessary and lubricate with clean
oil.
2.
Check tyre pressures and adjust if necessary.
3.
Check wheel nuts for tightness.
4.
Check all hydraulic cylinders, valves and pipe work for signs of leaks or
damage, repair or replace as necessary.
5.
Carry out lubrication
Weekly Maintenance
During the working season the following weekly maintenance should be carried out.
1.
Carry out all the procedures listed in daily maintenance.
2.
Check all shafts, bearings for undue wear and replace as necessary.
3.
Check all bearings for lubrication, grease as necessary.
4.
Check openers, soil retention panels, ridgers / moulding boards etc. for
excessive wear, replace if necessary.
Annual Maintenance
Prior to the start of the working season the following maintenance should be carried
out.
1.
Carry out all the procedures listed in daily and weekly maintenance.
2.
Check feed belts and cup belts for any damage or wear and repair or replace
as necessary.
3.
Check metalwork for any damage or wear and repair or replace as necessary.
4.
Inspect wheel bearings and check for excessive wear, replace as necessary.
5.
Replace the pressure filter element. Use only genuine Standen replacement
parts.
THESE ARE NOT WASHABLE ELEMENTS.
MAINTENANCE
1.30
Summary of Contents for ZENO 21
Page 2: ......
Page 4: ......
Page 10: ...1 5 SAFETY PRECAUTIONS...
Page 11: ...SAFETY PRECAUTIONS 1 6...
Page 41: ...Increase brightness Decrease brightness Z PAD SCREENS 1 36 Fig 43...
Page 44: ...Decrease row configuration Increase row configuration 1 39 Z PAD SCREENS Fig 50...
Page 47: ...Z PAD SCREENS 1 42 Decrease delay Increase delay Fig 57...
Page 50: ......
Page 51: ...Control Box DIAGRAMS 2 1...
Page 52: ......
Page 53: ...Distribution Box DIAGRAMS 2 2...
Page 54: ......
Page 55: ...Power Board DIAGRAMS 2 3...
Page 56: ......
Page 57: ...Sensor Valve Motor Board DIAGRAMS 2 4...
Page 58: ......
Page 59: ...16 pin Plug on Control Box and Distribution Box DIAGRAMS 2 5...
Page 60: ......
Page 61: ...2 Row Configuration Wiring DIAGRAMS 2 6...
Page 62: ......
Page 63: ...3 Row Configuration Wiring DIAGRAMS 2 7...
Page 64: ...2 7a DIAGRAMS...
Page 65: ...2 Row and 3 Row Hydraulic Circuit DIAGRAMS 2 8...