Commissioning
12
241408 / 857260300010
2018-02-02·BA00·III·en·01
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
SolConeX compact flange socket
Series 8572/15
8
Commissioning
20066E00
• Open the enclosure.
• Guide the conductors through the
cable entry and into the connection
chamber.
• Strip the conductors.
• Insert the conductors into the
corresponding terminals and
clamp them
(for tightening torque,
see chapter "Technical data").
Insert the stripped cable ends
completely under the terminal.
• Check if the conductors have been
clamped properly.
• Align the conductors. Make sure
that the clamping points are not
under tension.
• Tighten the cable entry/entries.
• Close the enclosure
(for the tightening torque,
see chapter "Technical data").
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
WARNING
Damage or destruction of the device by arc and high pressure is
possible if improper switching operations are used!
Non-compliance can result in severe or fatal injuries.
• Quickly switch the device on and off completely.
• Avoid switching positions between 0 and I (ON and OFF).