241408 / 857260300010
2018-02-02·BA00·III·en·01
Operation
13
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
SolConeX compact flange socket
Series 8572/15
Before commissioning, do the following:
• Check the mounting and installation.
• Enclosure must not be damaged.
• Remove any foreign bodies.
• If necessary, clean the connection chamber.
• Check if the conductors have been inserted correctly.
• Check whether all screws and nuts have been tightened firmly.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check whether all conductors have been clamped firmly.
• Observe the line voltage.
• Seal the unused cable entries with plugs certified according to Directive 2014/34/EU
or IEC and unused drilled holes with stopping plugs certified according to
Directive 2014/34/EU or IEC.
9
Operation
Only type 8570/12 and 8575/12 plugs from R. STAHL may be used.
When plugged in, the degree of protection of the 8575/12 plug is reduced to IP55.
10
Maintenance, Overhaul, Repair
10.1 Maintenance
• Consult the relevant national regulations to determine the type and extent of
inspections.
• Adapt inspection intervals to the operating conditions.
At a minimum, check the following points during maintenance work on the device:
• Firm fit of the conductors,
• Damage on the enclosure, seals or surface,
• Dirt on the sleeves,
• Compliance with the permissible temperatures (according to IEC/EN 60079),
• Whether the device is used in accordance with its intended use.
The flange socket may only be operated when fully mounted.
The flange socket can only be switched with the plug inserted.
If the plug has been disconnected, lock the hinged cover with the bayonet
ring.