Parameterization and Commissioning
44
147924 / 8146647300
2018-12-06·BA00·III·en·12
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
Safety switch / load disconnect switch
Series 8146/5-V37, Series 8150/5-V37,
Series 8146/5-V11
7.3.9 Opening and closing the Enclosure Cover
Opening the enclosure cover
Observe switch position: safety switch (...V37) in "I" position,
load and motor switch (...V11) in "0" position.
• Loosen the cover screws.
• Carefully open or remove the enclosure cover.
Closing the enclosure cover
Observe switch position: safety switch (...V37) in "I" position,
load and motor switch (...V11) in "0" position.
• Carefully attach the enclosure cover.
• Tighten cover screws.
8
Parameterization and Commissioning
Before commissioning, ensure the following:
• Check the mounting and installation.
• Inspect the enclosure for damage.
• Remove any foreign bodies.
• If necessary, clean the connection chamber.
• Check whether the cables have been inserted correctly.
• Check if all screws and nuts have been tightened firmly.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check if all conductors have been clamped firmly.
• Check whether all covers and partitions for live components have been installed and
fastened.
• Use stopping plugs that have an EC-type examination certificate or
an IECEx Certificate of Conformity to seal unused cable entries and drilled holes.
• Check the tightening torques.
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
Summary of Contents for Reihe 8146/5-V11
Page 93: ......