251652 / 612560300010
2019-04-10·BA00·III·en·05
Commissioning
17
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
Floodlight LED
Series 6125
8
Commissioning
Before commissioning, ensure the following:
• Check the mounting and installation.
• Inspect enclosure for damage.
• If necessary, remove foreign bodies.
• If necessary, clean the connection chamber.
• Check if the conductors have been inserted correctly.
• Check if all screws and nuts have been tightened firmly.
• Check if all drilled holes are closed.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check if all conductors have been clamped firmly.
• Check if the line voltage and the rated operational voltage are consistent.
• Check if the permissible conductor diameter for the corresponding cable entries have
been used.
• Check if the device is closed according to regulations.
• Check whether the bracket mounting & cover mounting screws are tightened with
proper torque.
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
NOTICE
Malfunction or device damage caused by condensation.
Non-compliance can result in material damage!
• operate the luminaire continuously or periodically over extended periods of time.
• avoid thermal bridges.
Summary of Contents for 6125 Series
Page 21: ......