32
CONNECTING POWER & GROUND CABLE TO BATTERY
© 2018 SSV Works, Oxnard, CA 93030 RZ3-5K Rev. D 2-1-18
C
B
A2
A3
E
D
B. Unscrew the factory nut on the negative battery terminal. Install
the 2 ground cables to the screw on the ground battery terminal.
Re-install the factory nut.
A1. Remove the bottom cover of the fuse holder
by extracting the 2 screws. Break off the right
and left side tabs on the bottom cover.
A2. Extract both fuse holder screws.
A3. Attach both the Power Wire and Battery
Terminal Cable to the fuse holder. Reattach
the bottom cover.
E. Zip tie all of the electrical cabling (factory and audio) along the center
column away from the drive shaft.
D. Remove the top of the fuse holder and extract the 2 screws. Insert the
40A fuse, screw the 2 screws back in and reattach the fuse holder top.
C. Unscrew the factory nut on the positive battery terminal. Install the 2
power cables to the screw on the postive battery terminal. Re-install
the factory nut.
Power
Wire
Battery
Terminal
Cable
A1
Break
off tab
Break
off tab
THIS CONCLUDES THE INSTALLATION PROCESS. REPLACE THE FACTORY PANELS AND SEATS.
QUESTIONS? PLEASE CONTACT SSV WORKS AT 818-991-1778 OR EMAIL [email protected]